CARGILL INDONESIA

WIKA BETON supply all column-beam-floor precast for the plant which is owned by Cargill Indonesia, which is in the target project completion within 4 months can be met by WIKA Beton thanks to technology and the capacity. With precast method, the work can be carried out simultaneously, because at the time of the beam-column-floor has been installed, Mechanical Engineering jobs can be carried out, as well as tools for the plant can be directly placed in its position, so that the intensified time in construction.